Thameside Primary School

Value: £62k
BRIEF SCOPE

During the summer break, the project included stripping out the current girls' and boys' restrooms to prepare for an upgrade.  The project included the construction of 6 new cubicles and the addition of 2 new accessible restrooms, along with new IPS and sanitary fixtures requiring plumbing and drainage. Additionally, a new suspended ceiling grid with washable ceiling tiles was installed.

The project involved installing new lighting, ventilation systems, hand dryers, fire alarms, and DDA alarms in both mechanical and electrical works. New fabric installations featured hygienic wall cladding, vinyl flooring, and decorative elements.